Abinsky ElectroMetallurgical Plant will start two more stages
Abinsky ElectroMetallurgical Plant (Krasnodar region) plans to start two more stages of production (the third and the fourth). The General Director of the plant, the deputy of the State Duma, Ivan Demchenko told about it during a meeting with the governor of Kuban Alexander Tkachyov.
Mr. Demchenko told that thanks to region support the plant received 75 hectares of the territory under construction. At present a half is used only.
The third stage, according opinion of Mr.Demchenko, will give the chance to produce more than 500 thousand tons of wire. The fourth stage will provide release fibre concrete and steel-cord.
The first stage at Abinsky ElectroMetallurgical Plant was constructed in 2010. Its productivity – 500 thousand tons of reinforcing steel a year. In the 3rd quarter 2013 new production on release of steel cast preparation was started.
To read completely: http://kuban.rbc.ru/krasnodar_topnews/18/06/2014/930978.shtml
Source: www.kuban.rbc.ru